Wednesday, January 30, 2019

Jigsaw Pipework

So the plumber was not impressed with our construction folk either.
He had to cut the pipe and bend it into the wall, rise it up, bend it around the corner and reattach to the up pipe.
I’m pretty damn impressed. I was half expecting to have to buy a new tub,

Tristan will be so pleased to have a shower. 
Did you all know there is such a thing as a sex bench? (I got this from my remodeler, not T).
I opted not to have one installed. :)
Also, the drain pipe was not to code, so the plumber had to fix that as well. It’s not level, but my remodeler will shim under the edge that isn’t flat so there is no bowing or bounce in the shower pan.


New pipes and mixer. Moved up the wall because you don’t sit down in the shower.
Mostly.

It sounds like the wall and tile get started tomorrow. We still haven’t figured out the countertop. We have a couple of options, one of which is buying the sheet of granite from floor and decor and making the cuts ourselves, to building the countertop out of plywood and adding tile to the top. 


The doorway, minus the door and door jamb. 
The plan is to trim it out with wood, instead of trying to repair the dry wall.
It looks like that because the original drywaller used his hammer to break off the left over piece instead of taking the time to cut it with a knife.
Just plain lazy.






No comments:

Post a Comment

Note: Only a member of this blog may post a comment.